Availability: | |
---|---|
Working Principle:
The saturated steam introduced from the steam joint condenses inside the dryer, and the released heat causes the temperature of the dryer to rise, thereby heating the paper sheet coated on the surface of the shell. Heat is transferred to the paper during contact between the paper and the dryer can surface.
Name | Dryer Cylinder |
Usage | Paper making machine |
Function | Drying paper sheet |
Model | 1000-3000mm |
Material | HT200,HT250 |
The main components of the dryer include: shell, dryer bars, siphon, shell head, manhole cover, bearing, shaft head, steam joint and so on.
(1) Packaging:
Products will be packaged according to their shapes, weight, transport distance and transport modes. Large machines will be packaged in sections. Every part of export machinery will be in standard export wooden package, waterproof film, straw rope, carton box ,etc, which will ensure the intactness of the products.
(2) Delivery:
1. sea transportation is from qingdao seaport or other ports.
2. the delivery time is decided by your needed machines or machine parts. But it also follows your needs.
FAQ:
1. Why we choose your company?
(1) more than 30 years experience of manufacture paper machine and pulp making machine;
professional engineer team ensure latest and best design;
professional project manager ensure perfect service for whole procedure,such as quotation preparation,arrange shipment,customs clearance;
2. Can I visit your company?
Yes, you can. Our company located in zhengzhou/qinyang city, the capital of Henan province in China, if you take plane, it will need about 2 hours from guangzhou city, 1.5hours from shanghai city and 1 hourfrom beijing city.we will pick you up from airport as well as the train station. We will take you to see our machine running in our chinese clients' paper mill.welcome you and your team to visit us at any time!
3. Payment terms:
(30% T/T within 10days after sign contract;
70% T/T before shipment ;
100% L/C is also acceptable;
4. Delivery time:
within 45 days after first payment.
Working Principle:
The saturated steam introduced from the steam joint condenses inside the dryer, and the released heat causes the temperature of the dryer to rise, thereby heating the paper sheet coated on the surface of the shell. Heat is transferred to the paper during contact between the paper and the dryer can surface.
Name | Dryer Cylinder |
Usage | Paper making machine |
Function | Drying paper sheet |
Model | 1000-3000mm |
Material | HT200,HT250 |
The main components of the dryer include: shell, dryer bars, siphon, shell head, manhole cover, bearing, shaft head, steam joint and so on.
(1) Packaging:
Products will be packaged according to their shapes, weight, transport distance and transport modes. Large machines will be packaged in sections. Every part of export machinery will be in standard export wooden package, waterproof film, straw rope, carton box ,etc, which will ensure the intactness of the products.
(2) Delivery:
1. sea transportation is from qingdao seaport or other ports.
2. the delivery time is decided by your needed machines or machine parts. But it also follows your needs.
FAQ:
1. Why we choose your company?
(1) more than 30 years experience of manufacture paper machine and pulp making machine;
professional engineer team ensure latest and best design;
professional project manager ensure perfect service for whole procedure,such as quotation preparation,arrange shipment,customs clearance;
2. Can I visit your company?
Yes, you can. Our company located in zhengzhou/qinyang city, the capital of Henan province in China, if you take plane, it will need about 2 hours from guangzhou city, 1.5hours from shanghai city and 1 hourfrom beijing city.we will pick you up from airport as well as the train station. We will take you to see our machine running in our chinese clients' paper mill.welcome you and your team to visit us at any time!
3. Payment terms:
(30% T/T within 10days after sign contract;
70% T/T before shipment ;
100% L/C is also acceptable;
4. Delivery time:
within 45 days after first payment.